8:54 pm June 24, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
the connector between lower Pneuma and middle Pneuma has been flagged. This will separate Pneuma and Hot Laps. Send me a message if you want to help with the trail work.
|
|
|
1:57 am July 8, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
Grade has been checked and brushing of the corridor is in progress. You can help. Seriously.
|
|
|
12:59 pm August 19, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
Post edited 5:46 pm – August 19, 2010 by Crosscheck
pwew, removing the duff has been tough going. The first 4 inches of organic matter is very matted and full of intertwined roots. Most of the time is spent cutting this layer into pieces so that it can be raked away. As such, progress has been slow. To account for this, I've split the reroute into two sections; part 1 and part 2. There is a ravine half way up that makes for a logical break between the two sections. We'll finish part 1 and open it to bike traffic before starting part 2.
75% of the tread for part 1 is ready to be opened. That leaves about 100m of tread to be cut. My rule of thumb is one person can cut 10m of tread an hour, so there is about 10 more man-hours before part 1 can be opened. The trail will be raw so we need lots of bike traffic on it in order to see where to fine tune it.
I have a couple of ideas I want to try that may increase productivity. As always, your assistance is welcomed 
|
|
|
12:41 am August 28, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
OPEN! The first part of the Pneuma EV to SS reroute is now open, and it needs you to ride it in. The trail is new and raw and needs as many tires as possible on it in order to see where the finishing work needs to be done. When climbing Pneuma, just as you cross EV, look to the right and you will see the entrance to the new section of trail. It will spit you out back on Hot Laps about half way up, so use caution and yield to the downhill riders.
Now, time to start working on part two. Part two will pick up where part one left off and connect with the Sulphur Springs reroute that CMBA built last year. When this is done, Pneuma and Hot Laps will be completely separate trails.
|
|
|
1:10 am September 16, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
Part two is well underway, with the first 250m of tread ready for riding. The trail corridor is almost cleared all the way to Sulphur Springs, about another 150m to go. I really need to get a decent gps track of the reroute so that I can stop guessing at the distances 
|
|
|
9:03 pm September 23, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
corridor is clear all the way to Sulphur Springs. Dirt work on the tread is in progress.
With the recent wet weather cows have made a mess of some of the tread on the lower section, which should be easy to fix.
A rancher put a salt lick on Hot laps right before it meets up with Elbow Valley, resulting in a massive mud pit where the trail used to be. I wouldn't want to ride through that as it looks pretty toxic. Thank goodness Pneuma doesn't go through there anymore 
|
|
|
10:29 pm September 29, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
The CMBA and the Potlickers MTB club came out last Saturday and we concentrated on cutting good quality bench for the approach to Sulphur Springs. The last 20 feet needs to be cut and the connection to Sulphur Springs will be made.
What we didn't get to was fixing the entrance by Elbow Valley. The cows have turned the trail into a rough trench. The ravine bypass, where part 1 and 2 meet, also needs to be buffed up. Stay tuned for more updates…
|
|
|
1:48 am October 4, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
Decided to call the connector open today. Cleaned up the entrance from Elbow Valley, buffed up the ravine bypass, and cut in the connection to Sulphur Springs today.
There are still sections that need work, but you can ride through them, so might as well call it open. The cows are using the trail, so we should too 
|
|
|
1:31 am October 21, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
the ravine bypass has a nice little bench cut on it. Jon has started work on a TTF over the ravine. We'll probably keep both lines, one rated as green, and the other blue/black. Take your pick.
also started to repair the cow damage just past EV. The first 100m of this connector is too bumpy, so its getting smooooothed out. (get it, cow damage, smoooothed out – haha)
Next up will be the climbing turns. There are 5 turns of note, and they need to be contoured in order to give them some nice flow.
so, the trail is open and being used, as I see tire tracks in the soft dirt. Work will continue until the weather turns. Final buffing will take place sometime next year. Wanna help? send me a message. Cheers.
|
|
|
9:11 pm November 4, 2010
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
cleaned up the first 150m of trail. Chopped out a lot of roots and made the tread wider in a few places. Still some work to be done, but really, its good enough for now.
I'd like to berm the switchback corners next. I've bumped into a few people using this trail as a downhill connector between SS and EV. This trail may end up seeing more traffic as a short cut for the Suffer Springs loop than as a climbing line for Pneuma. Cool. So, I need to put more time into making the downhill flow.
|
|
|
1:55 pm July 26, 2011
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
I'm baaack! The connector is in good shape with regular traffic going both up and dowm. I've started work on fine tunning the big switchback after the ravine to give it more downhill flow. There are a couple of more areas that I want to adjust for flow, but after that there really isn't much left to do except enjoy the ride
The TTF over the ravine remains incomplete, so beware.
|
|
|
4:12 pm August 22, 2011
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
Had a look at the trail last night and it looks like the Transrockies had no effect on it whatsoever. Knocked 3 small stumps out of the switchback corner just above the ravine, but ran out of daylight before I could contour the tread. I'll fix it after a few people have ridden a new line into it. The TTF over the ravine remains incomplete. hmmmm.
|
|
|
1:43 am September 3, 2011
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
all right, the bridge over the ravine is now open. Next decision is do we close the ravine detour as it runs right beside Hotlaps, or leave that option open for those that don't like heights?
|
|
|
9:46 pm September 12, 2011
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
The switchback above the ravine is now a nicely countoured inslope turn. I think the next area to work over is from EV to the ravine.
|
|
|
1:21 am October 10, 2011
| Crosscheck
Rookie
| | | |
| posts 27 |
|
|
the connector celebrated it's first birthday Oct 4 and it's an established section of trail now. I'm done posting in this thread and will start a new one that covers Lower Pneuma, from the start at Hwy66 until is crosses Sulphur Springs. Happy Trails.
|
|